EDC page
EDC Page

Emergency Device Checks
Once the Report Type Emergency Device Checks' is selected from the drop‑down menu the specification for the Emergency Device Checks can be downloaded via the View Spec link.

Location
Is selected from the menu, the locations are stored alphabetically, start typing and the selector will go down to the first matching location.

Add Location
Can be selected to add a new location, it will then be available in the drop‑down menu. A new location must be added and saved before it can be selected in the location box.

Select emergency device
To be inspected by description1 via the  menu or a new device can be added. A Defect can be logged or an Observation made.

defect
defect

Defect is a non-compliance or issue which needs rectifying.

Add action defect
Setting to this switch yes will show additional options.

Defect Description  Typing in the box will show previously stored matching descriptions. If not found the new defect description can be added to the list via the Add new Defect Description link.

Corrective Works required
Enter details of the anticipated corrective action.

Defect Code Number  1, 2 or 3 Based on Severity.

  1. Danger present, requires immediate remedial action
  2. Potentially dangerous, requires remedial action
  3. Not a hazard, but non-compliant

Add photo of the item/non-compliance. This is required and can be taken with your phone or tablet to ease identification then added in with ‘Choose file’ option.

Additional Comments can then be added but are not mandatory

complete
complete

The Test Completed switch is then set.

If the device passes all function tests the Passed switch can be set.

It must be confirmed the Device has been checked for signs of corrosion or damage.

The passed switch only relates to the function test and does not neccessarily mean it has passed the compliance inspection without defect.

Click on Save to complete the inspection2.


Note


  1. The description can be any character. However, beginning the description with the Tag Number may make identifyiing devices easier in line with drawing. 

  2. The item inspection cannot be saved until all mandatory fields are completed including adding a photo for the defect. 

🔝